
Passive fire protection · UK-wide · Est. 2017
Cavity barriers & fire stoppingfor high-rise facades
FIRAS-certified installation of cavity barriers and penetration seals (Certificate No. JA8184), plus linear gap seals, slab edge fire stopping and remedial works — photographed, reported daily and inspected before sign-off.
£10m public liability · NVQ Level 2/3 installers · 24/7 for urgent call-outs
FIRAS certified
Certificate No. JA8184 (Warringtonfire), cavity barriers and penetration sealing, valid to 22 July 2031
£10m public liability
Cover held for every project
NVQ Level 2/3 installers
Led by site supervisors and FIRAS-accredited supervisors
Established 2017
Technicians with up to 20 years in the trade
What we install
Tested, approved systems on high-rise facades and inside the building.
Cavity barriers — FIRAS certified
Open-state and closed-state cavity barriers in rainscreen facades and external walls, installed to the tested system at every floor line and compartment line. FIRAS certified (Certificate No. JA8184).
Read morePenetration sealing — FIRAS certified
Fire stopping around pipes, cables, ducts and service penetrations through fire-rated walls and floors, with intumescent sealants, collars, wraps and boards from tested systems. FIRAS certified (Certificate No. JA8184).
Read moreLinear gap seals & slab edge fire stopping
Sealing the joints between walls, floors and the facade, and the slab edge on high-rise buildings, so fire and smoke cannot pass between floors.
Read moreFacade & cladding fire barriers
Fire barriers behind cladding and in facade build-ups on high-rise residential and commercial buildings, working alongside the facade contractor's sequence.
Read moreRemedial works
Visual inspection, identifying non-compliant installations, removing them and installing tested systems in line with Approved Document B and the Building Safety Act.
Read moreFire-rated glazing & inspections
Fire-rated glass to E30 / EI60, visual inspections of existing fire stopping, and acoustic sealing.
Read more
Projects we have worked on
See our work- 8 Bishopsgate, LondonFIRAS Certificate of Conformity issued
- Canada Water A2, LondonFIRAS Certificate of Conformity issued
- Southbank Place B5, LondonFIRAS Certificate of Conformity issued
- Angel SquareFIRAS Certificate of Conformity issued
- 10 King William Street, LondonIn progress
How we work
- 1
Send your drawings
Drawings, specification or the scope — we price from them, free.
- 2
Survey and method
We check the site and agree the tested system and the sequence with your team.
- 3
Install, photographed stage by stage
Installed to tested, approved systems; photos at every stage and a daily report.
- 4
Inspection and sign-off
Internal inspection before sign-off and, for FIRAS-certified scopes, a FIRAS Certificate of Conformity.
A specialist installer, since 2017
Based in Hatfield, Hertfordshire, working on high-rise buildings across the UK.
5–15 installers per project, all NVQ Level 2/3
About usSend your drawings for a quote
Drawings, specification or a short description of the scope — we will come back to you with a quote.
Send your drawings for a quote